Workspace

Load a governed decision

This walkthrough runs on a synthetic $10M portfolio with 62% concentration in technology. Version 1 loads an oversized hedge that breaches the mandate; version 2, corrected, passes with conditions. First time here? Start with version 1. The guidance rail inside the workspace explains each step as you advance.